LIGHTNING RISK ENGINEERING

Building Lightning Risk Assessment, LPL Selection & Design Inputs

Preliminary and detailed assessment support for industrial, infrastructure, transport, healthcare, commercial and mission-critical projects.

SN Engineering Scope
  • Site survey and data review
  • Risk-assessment support
  • Design, BOQ and material selection
  • Supply, installation, testing and AMC

Required Data

Building Geometry

Length, width, height, roof levels, projections, tanks, antennas and nearby structures.

Location

Coordinates, terrain, isolation, elevation and authoritative lightning-density data.

Occupancy & Use

Population, evacuation, public access, critical operations and service continuity.

Construction & Contents

Fire load, explosive material, structural materials, sensitive electronics and asset value.

Incoming Services

Power, telecom, data, pipelines, CCTV, signalling and external instrumentation.

Consequences

Life safety, fire, environmental damage, downtime, data loss and economic impact.

Preliminary Collection Area

For a simple isolated rectangular structure, a common preliminary geometric expression is:

Ad = L × W + 6H(L + W) + 9πH²

This is not a complete risk assessment. Location, line collection areas, probability factors and consequence factors must also be evaluated.

Deliverables

  • Risk-input schedule
  • Protection requirement recommendation
  • LPL recommendation where supported
  • Design basis note
  • Air-termination concept
  • Earthing and SPD coordination note
  • Preliminary BOQ

Inspection, Maintenance and AMC

Visual Inspection

Check terminals, masts, conductors, joints, labels, supports, corrosion and mechanical damage.

Electrical Testing

Verify continuity, bonding, earth-system performance and SPD status using appropriate test methods.

Post-Strike Review

Inspect after a recorded event, severe storm, roof alteration or electrical modification.

AMC Documentation

Maintain inspection reports, earth-test records, event-counter readings, photographs and corrective-action BOQ.

Request a Technical Proposal

SN Engineering Project Support

Site survey, lightning risk assessment support, ESE or conventional system design, BOQ, material supply, installation, testing, commissioning and AMC.

Required inputs: site location, building dimensions, roof drawing, application, electrical single-line diagram, existing earthing and project specification.