Tender Hub
Tender, BOQ & EPC

Lightning Risk Assessment Service — Method Statement

Lightning Risk Assessment Service — Method Statement: tender, BOQ, EPC, procurement, testing, documentation and handover guide.

Lightning Risk Assessment Service — Method Statement is a project-procurement page for government buyers, consultants, EPC contractors, tender teams, QA/QC engineers and project managers.

Tender Objective

The tender should define a measurable and coordinated scope covering design, supply, installation, earthing, bonding, surge protection, testing, documentation and handover. Generic product names without drawings, quantities and acceptance criteria can create commercial disputes.

Technical Inputs

Drawings, structure dimensions, risk assessment, electrical SLD, soil information, equipment schedule and applicable standard.

Commercial Inputs

Quantities, unit rates, taxes, logistics, installation, testing, warranty, exclusions and completion schedule.

Quality Inputs

Datasheets, compliance statement, ITP, method statement, inspection hold points and traceable test records.

Handover Inputs

As-built drawings, photographs, test reports, warranty, training and O&M manual.

Typical BOQ Structure

BOQ GroupTypical ScopeMeasurement Basis
DesignSurvey, calculations, risk review and drawingsLot, building or structure
Air TerminationAir terminals, masts, mesh conductors, supports and accessoriesNumber, metre or set
Down ConductorsConductors, clamps, guards, test joints and transition connectorsMetre or number
Earthing and BondingElectrodes, ring/grid, pits, backfill, earth bars and bondsNumber, metre or set
Surge ProtectionPower, data, telecom and control SPDsNumber or set
TestingVisual, continuity, earth tests and SPD verificationLot or test point
DocumentationDatasheets, reports, as-built drawings, warranty and O&MLot

Technical Bid Checklist

  • Applicable standard and design basis identified.
  • Drawing and BOQ references match.
  • Materials and dimensions are measurable.
  • Dissimilar-metal connections are addressed.
  • SPD schedule includes panel and circuit references.
  • Testing methods and acceptance records are defined.
  • Warranty and maintenance scope are clear.

Commercial Bid Checklist

  • Supply, installation and testing separated where required.
  • Taxes, freight, unloading and storage clarified.
  • Civil work, scaffolding, waterproofing and shutdowns clarified.
  • Provisional quantities and variation rules defined.
  • Payment milestones and completion schedule defined.

Target Keywords

Lightning Risk Assessment Service — Method Statementgovernment tenderlightning protection BOQturnkey EPCtechnical bidcommercial bid

Common Tender Risks

Major risks include incomplete drawings, generic quantities, unsupported approval claims, unclear civil scope, mismatched metals, missing SPD coordination, untraceable testing and incomplete handover requirements.

Frequently Asked Questions

Can the BOQ be finalised without approved drawings?

Only a provisional BOQ can be prepared. Final quantities should follow approved plans, elevations and actual routes.

Should testing be a separate BOQ item?

It may be included in installation or listed separately, but the scope and required records must be clear.

Can an approval be claimed without documentary evidence?

No. Compliance and approval claims should be supported by current, relevant documents.

Related Tender Pages

Tender and BOQ Support

Share tender documents, drawings, BOQ and submission date for a project-specific review.